Difference between revisions of "DoT document hunt"

From Deh Cho BridgeWiki
Jump to: navigation, search
(On Course)
m
Line 1: Line 1:
 
There are a few reports that I've seen mentioned that I can't seem to find on the Department of Transportation website.
 
There are a few reports that I've seen mentioned that I can't seem to find on the Department of Transportation website.
  
*A feasibility study for a Seasonal Overland Road from Tibbett Lake to Lockhart Lake (mentioned in the [http://www.dot.gov.nt.ca/_live/documents/content/On%20Track%20document.pdf Nov 2011 On Track] publication.  Has this been completed, and would it be possible to obtain a copy?
+
*A feasibility study for a Seasonal Overland Road from Tibbett Lake to Lockhart Lake (mentioned in the [http://www.dot.gov.nt.ca/_live/documents/content/On%20Track%20document.pdf Nov 2011 On Track] publication).  Has this been completed, and would it be possible to obtain a copy?
  
 
*There's also a "Tlicho Road Corridor Study" mentioned, an "''an economic analysis of the costs and benefits of realigning the Tlicho winter road to an overland route''".  Couldn't seem to find a copy of that anywhere.
 
*There's also a "Tlicho Road Corridor Study" mentioned, an "''an economic analysis of the costs and benefits of realigning the Tlicho winter road to an overland route''".  Couldn't seem to find a copy of that anywhere.

Revision as of 08:55, 1 March 2012

There are a few reports that I've seen mentioned that I can't seem to find on the Department of Transportation website.

  • A feasibility study for a Seasonal Overland Road from Tibbett Lake to Lockhart Lake (mentioned in the Nov 2011 On Track publication). Has this been completed, and would it be possible to obtain a copy?
  • There's also a "Tlicho Road Corridor Study" mentioned, an "an economic analysis of the costs and benefits of realigning the Tlicho winter road to an overland route". Couldn't seem to find a copy of that anywhere.
  • KAVIK-AXYS Inc. 2008. Multi-level mapping and route analysis Tlicho transportation corridor. Route Identification and Evaluation. Prepared for Department of Transporation. (from Fortune's NICO Developer's Assessment Report) - this may be same as above.
  • DOT’s Ferry Strategy/Plan of Action entitled “On Course” (mentioned in 2011/12 Business Plan).